PREPARATION:

  • Concrete needs at least 28 Days to be fully cured.
  • Etch the floor or Grind it.
  • To acid wash, Dilute one third Hydrochloridric acid with water,
  • Add Acid to the water tank,
  • Pour on floor, Use broom to spread it out,
  • Wash it by high pressure washer after 5 Min.
  • Apply PRIMIT when the floor is dried, Use 12 mm nap roller.
    • Follow the ratio, Mix thoroughly by Mixer, Pot life two hours,
    • Cut edges and corners first.
    • EPOXY PRIMER, Needs to be applied on bare concrete as a thin layer to penetrate and needs 8 hours to dry.
  • Inspect the floor, Needs to be dried.
  • Patch Cavities and Cracks by Builderpox.
  • Apply First Coat by roller, Use 12 mm nap roller
    • Follow the ratio, Mix thoroughly by Mixer, Pot life 30 Min,
    • Mix Small Batch, Use Scale, Mix by Weigh not Volume.
    • Cut edges and corners first.
    • Pour on Floor, Use Squeege to spread it out, apply by 270 mm roller, Check not to leave any line behind. Needs 8 hours to walk on.
  • Apply Second Coat by roller, Use 12 mm nap roller
    • Follow the ratio, Mix thoroughly by Mixer, Pot life 30 Min,
    • Mix Small Batch, Use Scale, Mix by Weigh not Volume.
    • Cut edges and corners first.
    • Pour on Floor, Use Squeege to spread it out, apply by 270 mm roller, Check not to leave any line behind. Needs 24 hours to walk on.
    • Needs 7 days to fully cured
  • Do not wet the area at least for seven days depends on the weather condition.